Memory — 2026-02-21

Auto-saved at 4:06 AM ET — 1AM PST Night Review cron (8624166a)

Tonight’s Work (Feb 21 — 4AM ET)

T-041 FIXED ✅

  • Same pattern as Stats tab fix. All 4 Chart.js charts now work correctly.
  • Committed to mission-control repo (commit d333721)

Pitch Deck Draft ✅

  • Full slide content drafted: Hybrid A+B approach (lead with traction + AI layer slide)
  • Saved at: /data/.openclaw/workspace/data/pitch-deck-draft-2026-02-21.md
  • 10-slide structure ready to implement in Google Slides
  • NEEDS FROM NADER/MIKE: MRR data (Dec/Jan/Feb), company names for team slide, unit economics confirmation
  • DUE DATE: Tuesday Feb 24 — 3 days away

Board Updates (9 tickets)

  • T-041: Fix deployed note + QA checklist
  • T-028: Pitch deck draft complete, slide summary, what’s needed
  • T-001: Ahmadreza SFTP block flagged (Mike needs to share access link)
  • T-003: BIN lookup confirms Option 2 is the right commission design
  • T-034: Flagged TwillPayments PAT as blocker for repo sync
  • T-040: Marked ready for Done — awaiting Mike sign-off
  • T-042: 4 new CRM leads detailed (RAC Financial, Brandon Baker, EPosNow, Christian G.)
  • T-044: MCC inconsistency (3 sources) flagged from Fireflies
  • T-032: UI overhaul status — T-041 fixed, remaining items listed

Push Result

  • Commit d333721 pushed to twilloverthinker/mission-control
  • board.json + index.html both updated
  • Cloudflare Pages deploy auto-triggered

Key Intel from Latest Fireflies

Technical (from latest Tech Sync)

  • MCC codes: 3 sources of inconsistency — hard-coded UI, PayEngine API, Facade JSON
    • Martin creating ticket for single source of truth
    • Blocks processor routing logic in T-006/T-026
  • Ahmadreza blocked: MCA SFTP report workflow needs Mike’s access link + sample report
  • Bank account immutability bug in PayEngine: blocking partial submissions
  • 2 P0 dev tickets currently in progress
  • Commission formula: volume × 15bps - expenses (BIN lookup for card type)

Business (from latest calls)

  • RAC Financial ($10B/yr, 300 sub-agents): Thursday demo (Feb 26) confirmed
  • Brandon Baker: Tuesday Feb 24 10AM MT demo confirmed (reviewing API docs)
  • EPosNow/Kadeem: NY in-person meeting planned (Mike has site visit)
  • Production alerts: logging near ingestion rate limit, storage increase needed

Critical Next 72 Hours

  1. T-028 PITCH DECK: Nader/Mike need to provide MRR data + implement slides by Monday
  2. T-001 MASON: Schedule intro by Monday (5 days stale)
  3. T-001 MCA SFTP: Mike needs to share SFTP link with Ahmadreza (blocks dev work)
  4. T-040 RUN ANALYSIS: Mike to confirm → move to Done
  5. T-042 CRM LEADS: Mike to approve adding 4 new leads to partners.json
  6. Tuesday 10AM MT: Brandon Baker demo

Strategic Operating Brief (10:20 AM ET, Feb 21)

  • Generated overdue Friday weekly brief (posted to open-claw-nader, messageId: 1771687390.816769)
  • 3 new Fireflies meetings ingested: Ahmad <> Nader (Feb 20, 14min), Data Insights (Feb 18, 70min), Weekly Planning (Feb 17, 60min)
  • Ahmad <> Nader: no transcript content yet (metadata only)
  • Weekly Planning (Feb 17): Nader + Mike discussed AI disruption of SaaS — conclusion: hard-code deterministic workflows, don’t open-end AI tool use (safety + regulatory posture)
  • Data Insights (Feb 18): Commission formula volume × 15bps - expenses, BIN lookup approach confirmed; Ahmadreza blocked on Interchange rate access + residual report access

Status: Active Blockers

  • Mike: SFTP access link for Ahmadreza, Mason scheduling, T-040 sign-off, T-042 CRM approval, T-031 vendor questions
  • Nader: T-028 MRR data, T-003 commission design decision (Option 2 recommended), T-034 PAT for TwillPayments org
  • External: Brave API key (limits web research speed 10x)

12h PM Dashboard Push (1:50 PM EST)

  • activity.jsonl: new PM cycle entry appended
  • GitHub push: commit 57dd99e (2 files changed, 31 insertions, 26 deletions)
  • Cloudflare Pages deploy: ✅ https://695534c5.mission-control-giv.pages.dev
  • Highlights this cycle: T-041 charts bug fixed, T-028 pitch deck 10-slide draft done (due Tue Feb 24), SOB posted, 9 board tickets refreshed, 2 high-stakes demos this week