Morty — Daily Memory: 2026-02-24

Overnight Session (5:11 AM - 5:50 AM EST)

Nader was sleeping for 8 hours. Ran as a subagent to work through the full ticket queue.

Tickets Moved to In Review (31 total)

P0

  • T-057 — Priority (MX Connect) Integration: Full API deep-dive. 5-step UAR boarding flow documented. Auth (10-min JWT), reporting API, capability matrix vs EMS/Luqra. Integration spec with code samples. Sandbox pending credentials from integratedSolutions@prth.com.
  • T-046 — Processor Marketplace: Full spec with 10-processor registry, agent scoring logic (5-dimension, 100-pt), marketplace API endpoints, 4-phase implementation plan.

P1

  • T-053 — Statement-to-Pitch Engine: Parsing schema (20 fields), 7-stage AI pipeline (OCR→LLM→savings→PDF), format map for 10 processors, 3-week implementation plan.
  • T-051 — Dead Deal Dialer: 4 voice scripts, trigger logic (72h stall, 3 attempts), Vapi/Twilio integration architecture, document upload link system, TCPA notes.
  • T-049 — Partner Solutions DB: Schema v2, PR-001 fully populated, capture workflow defined, roadmap insights extracted.
  • T-048 — MCA Pre-Qual Widget: 3-field form, Python scoring model, results UI, agent URL system (qualify.twillpayments.com/[slug]), iFrame+JS embed, 4-week plan.
  • T-047 — Processor Arbitrage Engine: Monthly cron, 4-tier alert thresholds, auto-generated switch package (pre-filled app + pitch email + dashboard card), DB schema.
  • T-044 — Partner CRM Tab: 12 enhancements documented with code. Staleness badges, contact info in modal, ICP score display, search/filter, pipeline stats bar.
  • T-042 — Competitive Analysis: 9 competitors across 3 tiers, 5-layer moat framework, pricing position, 5 market gaps.
  • T-040 — Lead Gen Sub-Agent: Existing pipeline documented (150 candidates/day, 15 qualified). 5 gaps filled. CRM bridge, outreach drafts, dedup, 15-query expansion.
  • T-037 — Social Media: Twitter/Reddit strategy, 30-day content calendar (March), 6-subreddit map.
  • T-028 — Statement Submission Selector: 6-dimension scoring algorithm, JSON output, UI mockup, integration map.
  • T-006 — Apollo List: 20-lead list compiled (15 individual contacts w/ emails, 5 company-level). Two outreach templates.

P2 (15 tickets)

T-52, T-50, T-45, T-24, T-23, T-20, T-19, T-18, T-17, T-16, T-15, T-14, T-13, T-12, T-11, T-10, T-09, T-08

All received design specs, implementation plans, and “what Nader needs to do” sections.

Tickets Moved to Blocked (2 this session)

  • T-036 — Repo Sync: Still needs TwillPayments org GitHub PAT. Day 5 blocked.
  • T-035 — SixPac Research: Portal password not in workspace. Mike needs to classify relationship (referral vs. processor). Assessment: SixPac = ISV/referral partner.

Key Findings

  1. n8n (T-045): Only used as a webhook relay for the marketing website. Safe to cancel after replacing with CF Worker (20-50/month savings.
  2. processors.json had 24 junk entries (web search artifacts). Cleaned to processors_clean.json with 11 real processors.
  3. Lead gen is working — 15 qualified leads from Feb 23 run. Arthur Royzen (score 81) already in CRM as P-003.
  4. Priority/MXC sandbox: Must email integratedSolutions@prth.com — this is the #1 blocker for T-057 implementation.
  5. Vapi API key missing: Blocks T-010 (Voice AI MVP) and T-051 (Dead Deal Dialer).
  6. Fireflies API token missing: Blocks T-044 (CRM auto-updates) and T-014 (podcast).

Files Created/Updated This Session

  • /data/.openclaw/workspace/data/mxconnect_integration_spec.md
  • /data/.openclaw/workspace/data/processor_marketplace_spec.md
  • /data/.openclaw/workspace/data/partner_solutions.json (schema v2)
  • /data/.openclaw/workspace/data/processors_clean.json (v2, 11 real processors)

Actions Needed from Nader When He Wakes Up

Urgent:

  1. Email integratedSolutions@prth.com for Priority/MXC sandbox credentials
  2. Provide Vapi API key → enables T-051 and T-010
  3. Begin outreach to top 5 leads from T-006 list (Arthur Royzen first)

High priority: 4. Provide Fireflies API token 5. Confirm SixPac relationship type (T-035) 6. Create TwillPayments org GitHub PAT (T-036 — 5 days blocked) 7. Cancel n8n after Morty replaces website webhook (T-045)

Confirm/review: 8. Review T-046 processor shortlist + fill pricing data 9. Review T-048 MCA scoring multipliers + factor rate range 10. Review T-042 competitive analysis report